Page 124 - JSOM Spring 2020
P. 124

FIGURE 2  A representation of excerpts of the outputs from each of the Human Performance Optimization Total Force Fitness Capabilities-Based Blueprint (CBB) Workshop and Targeting System’s four
                                                                      Nutritional  Poor Nutrition   (53.5%)  Dehydration   (19.7%)  Increased   Alcohol Use   (16.9%)  Diagnosed   with Vit D   Deficiency   (5.6%)







                     Task 2  Task 1              applicable to all PICT  Spiritual  Difficulties   Living Out My   Personal Values   (23.9%)  Loss of Sense   of Purpose   (16.9%)  Feeling   Disconnected   from the RPA   Mission (5.6%)  Difficulties   Living Out   USAF Core   Values (4.2%)





                  PERFORMANCE FACTORS                               HEALTH AND DISEASE TRENDS  Social  Relationship   Problems (32.4%)  Difficulties   Relating to Others   Due to Ops Sec/  Info Sec (26.8%)  Difficulties   Forming   Meaningful   Relationships   (25.4%)






                       Physical demands/resources  Visual acuity     Reaction time    Psychological demands/resources  Attention     Memory     Spiritual demands/resources Feeling connected to the mission     Warrior’s ethos/core values     Psychological  Physical   Sleep   Eye Strain   Disturbances   (70.4%)  (81.7%)  Mental   Back Pain   Exhaustion   (64.8%)  (74.7%)  Struggle  Weight Gain   with Work-  (56.3%)  Life Balance   (56.3%)  Combat/Kill  Headaches   Chain-Related

















                  CRITICAL TASK LIST AND METRICS  Task Metric Scoring  Task   Exceptional  Proficient  Metric  On target  On target   Speed on   within 1/3   within   Target  of maximum  maximum   time allotted time allotted   (within 50%   time allotted   is expected)  N/A  Locates   Locate   target  Target  N/A Maintains   Maintain   target  Target  N/A Appropriate   Tracking   tracking   Type   type used  Process  CONDITIONS/EXPOSURES 1U Conditions Specific to Performance
















                       Task   Task Name  No.  Fixed   Target   1  Acquisition  Mobile   Target   2  Acquisition  Temperature  Lighting  Noise  Facilities  Station   Ergonomics  Remote/  Deployed   Environment










                  CBB REPORT                                       1U SENSOR OPERATOR HPO/TFF CBB




             preceding phases.








          118  |  JSOM   Volume 20, Edition 1 / Spring 2020
   119   120   121   122   123   124   125   126   127   128   129