Page 193 - 2026 SMOG
P. 193

IMPACT 754 VENTILATOR:
                PRE-MISSION CHECKS AND TROUBLESHOOTING
         4.  GAS OUT: clear leaf valve installed and seated (Reseat if loose, replace if missing).
           See replacement instructions at the end of this document.













         5.  Inspect green high-pressure oxygen hose for cracks, dry rot, threads, and the black O-Ring
           (Replace if damaged).











         6.  Connect the ventilator to a high-pressure oxygen source, turn on the oxygen tank, and ensure
           no leaks are present. Turn off O  when complete. (Conduct in an environment conducive to
                               2
           hearing leaks)










                                                                   (continues)





                          2026 Standard Medical Operating Guidelines (SMOG)  •   185
   188   189   190   191   192   193   194   195   196   197   198