Page 212 - 2023 SMOG Digital
P. 212

c. Connect the transducer hose to the original transducer fitting and the other end to
                     regulated oxygen source.
                  d. Connect the transducer fitting (still attached to the circuit) to the air inlet port.
                  e. Set regulator on O 2  source to 10 LPM to deliver up to 99% FiO 2 .
         NOTE: Ventilator circuit tubing will provide reservoir for 650-700ml of O 2 . Vt of greater than 650-700ml
                                may result in lower FiO 2 .















































        212
   207   208   209   210   211   212   213   214   215   216   217